400 mm HDPE Dredging Pipe: 991 m Shipped to Malaysia With Flanges Fitted

On 20 September 2026 BSX loaded a HDPE dredging pipe order at Qingdao for a shipping company in Malaysia: 84 lengths of PE100 pipe, OD 400 mm, PN10, SDR17 — 991 metres in total — with carbon steel flanges already fitted at both ends, plus six 3-metre rubber hoses and 90 spare gaskets. The shipment travelled in four 40HQ containers and reached Pasir Gudang on 8 October, 18 days after loading. The customer has said it will order again.
Shipment quick facts
|
Item |
Detail |
|
Destination |
Pasir Gudang, Johor, Malaysia |
|
Customer |
**Malaysia |
|
Project |
Coastal desilting / marine sediment removal |
|
Order type |
First order |
|
Product |
PE100 HDPE dredging pipe, black with blue stripe, 100% virgin material |
|
Dimensions |
OD 400 mm · PN10 · SDR17 (23.5 mm wall) · 11.8 m per length |
|
Pipe quantity |
84 lengths · 991.2 m |
|
Flexible joints |
6 × rubber hose with flanges, 400 mm PN10, 3 m each |
|
Spares |
90 rubber gaskets, supplied free of charge |
|
End connection |
Carbon steel flanges fitted at the factory, bolted on site |
|
Containers |
4 × 40HQ (cargo filled three and a half) |
|
Loading |
Conveyor-belt loading; gaps packed so the load cannot shift |
|
Port of loading |
Qingdao, China |
|
Loaded |
Qingdao, 20 September 2026 |
|
Arrival |
Pasir Gudang, 8 October 2026 (18 days after loading) |
|
Lead time |
25 days from order to loading |
|
Standard |
PE100, ISO 4427 / EN 12201 |
|
Customer feedback |
Very positive; customer plans to reorder |
A dredging line is four parts, not one
Most enquiries start with the pipe. What stops a line from working on site is usually something else.
|
Part |
What it does |
What shipped here |
|
Pipe |
Carries the slurry from the dredger to the discharge point |
84 × 11.8 m, OD 400 mm, SDR17 |
|
Flange |
The joint: two flange faces, one gasket, bolts |
Carbon steel flange fitted to both ends of all 84 lengths before loading |
|
Rubber hose |
Absorbs movement and misalignment at the dredger, at bends, and between floating sections |
6 × 3 m, 400 mm PN10 |
|
Gasket |
Seals each bolted joint |
90 pieces, supplied as free spares |

A 991-metre line is not 84 independent pipes. Put all six hoses into the line and it has 89 joints, and every one of them has to seal, hold pressure and come apart again when the line is repositioned — which is why the joint hardware is the part worth ordering together with the pipe.
Specifications as shipped
|
Product |
OD |
Pressure / SDR |
Length |
Qty |
|
HDPE dredging pipe (PE100) |
400 mm |
PN10 · SDR17 |
11.8 m |
84 pcs |
|
Carbon steel flange, fitted to pipe ends |
400 mm |
— |
— |
168 pcs |
|
Rubber hose with flanges |
400 mm |
PN10 |
3 m |
6 pcs |
|
Rubber gasket (spare) |
— |
— |
— |
90 pcs |
Why 400 mm, PN10, SDR17
SDR is the ratio of outside diameter to wall thickness, so SDR17 on a 400 mm pipe means a 23.5 mm wall, and for PE100 that wall is rated PN10 — 10 bar. In dredging the wall has a second job: it is wear allowance.
Slurry carries sand, silt and shells past the wall at speed. Wear shows up first at bends, on the bottom of horizontal runs and at the discharge point, and a thicker wall buys service life before a section has to be rotated or replaced. Where the slurry is more abrasive or the pressure higher, a lower SDR (thicker wall) is the usual step; where it is gentler, a higher SDR costs less per metre. If you are comparing SDR options for a project, this guide to how to choose HDPE dredging pipes walks through the trade-off.
PN10 sets the pressure ceiling at 10 bar, which should be checked against the pump discharge head plus surge on each project. It is also the rating the rubber hoses are matched to, so pipe and hose are supplied to the same flange pattern.
For a wider explanation of how these lines are put together — floating, submerged and shore sections — see what an HDPE dredge pipe is used for .
Flanges fitted before the container left
All 84 lengths arrived with carbon steel flanges already on both ends. On site that changes the job from fabrication to assembly:
- no field welding and no fusion machine at the waterside
- less alignment work on a floating platform or barge deck, since the flange faces are already fitted square to the pipe
- each joint is a gasket and a set of bolts — the same operation whether it is done on land or on water
- sections can be unbolted and re-positioned as the dredging line moves
Dredging lines get reconfigured constantly. A bolted joint made with hand tools suits a moving spread better than a joint that needs a welding crew.
Loading: conveyor belt, four containers
Four 40HQ containers shipped, and the cargo filled three and a half of them: three full containers and a fourth about half full. The pipe went in on a conveyor belt rather than by crane, with the lengths laid so the flange faces could be checked at the door, and the gaps in each container were packed so the load could not shift in transit. Rubber hoses and gaskets travelled in the same shipment, so nothing had to follow by air freight later.

Eighteen days, Qingdao to Pasir Gudang
The cargo left Qingdao on 20 September and was discharged at Pasir Gudang on 8 October, 18 days later. Production and loading took 25 days from order confirmation — the flanges were fitted inside that window, not added afterwards.
What the customer said
The customer’s feedback after delivery was very positive. It focused on two things: how the enquiry was handled, and the quality of the recommendations made for the project. The order was a first purchase, placed without a factory visit, and the customer said it will order again next time.
What this means for Malaysian marine works
Coastal work in Malaysia — port maintenance dredging, channel desilting and land reclamation — runs in seawater, at high ambient temperature, with UV exposure on any floating section. Three properties of HDPE matter there:
- Abrasion. BSX’s own product data rates HDPE wear resistance at 4 to 8 times that of steel pipe against sand, gravel and shell.
- Weight. HDPE is less dense than water (about 0.95 g/cm³), so an empty or sealed section floats, and a 400 mm length is far lighter than steel pipe of the same size. That is what makes floating strings and repositioning practical.
- Corrosion. Seawater does not rust the HDPE pipe body, and the pipe does not scale on the inside, so flow capacity stays stable over the service life. Black PE pipe is carbon-black stabilised for UV exposure on floating sections.
The same pipe is used beyond dredging — for drainage and wastewater pipeline systems where abrasion and corrosion both apply. Floating configurations are covered on the floating dredging pipeline page.
FAQ
What exactly was shipped?
84 lengths of PE100 HDPE pipe, OD 400 mm, PN10, SDR17, 11.8 m each — 991.2 metres. Plus 6 rubber hoses of 3 m with flanges, and 90 spare rubber gaskets. Total 991 m of rigid pipe and 18 m of flexible hose.
Why SDR17 rather than a thinner wall?
SDR17 gives a 23.5 mm wall on a 400 mm pipe, which is the wall rated PN10 for PE100. Dredging wears the pipe from the inside, so that wall is also service life against sand and shell abrasion. A thinner wall (a higher SDR) is cheaper per metre but has a lower pressure rating and less wear allowance, so it is replaced sooner.
Do the pipes arrive with flanges?
Yes, on this order both ends of all 84 lengths were fitted with carbon steel flanges at the factory. On site the joint is a gasket plus bolts, with no welding or fusion equipment needed to join pipe to pipe.
What are the rubber hoses for?
They take the movement the rigid pipe cannot: at the dredger connection, at bends, and between floating sections as the line shifts with tide and swell. Six 3-metre hoses were supplied with the same 400 mm PN10 flange pattern as the pipe.
How long a line does 991 metres make?
991 metres of pipe plus 18 metres of hose, so just over one kilometre of dredging line. With all six hoses in the line it has 89 joints, and 90 gaskets were supplied against that.
How many containers did the order need?
Four 40HQ containers shipped. The pipe, hoses and gaskets filled three and a half of them — three full containers and a fourth about half full. The loading plan is made per order, and the container count is confirmed with the quotation.
Can this specification be repeated?
Yes. Diameter, SDR, flange drilling pattern and hose configuration are held as a repeatable specification. Send the pump discharge head, slurry type and line length to request a quotation for the same configuration .
Request a quotation
Send the line length, pipe diameter, pump discharge pressure and slurry type, and BSX will return a complete bill of materials — pipe, flanges, hoses and gaskets — with pricing and lead time. Product data: HDPE dredging pipe . Floating configurations: HDPE floating dredging pipeline . Site systems: drainage and wastewater solutions .
Email: [email protected]